Gülbahar 2 Unlicensed Solar Power Plant was established in Antalya Elmalı within Gülbahar Enerji Yatırımları AŞ. Installation works started in January 2016 and the power plant was commissioned and started production in May 2016. The plant was installed on approximately 29 decares of land using 7920 250 Wp Polycrystalline PV panels and 60 33 kW solar inverters, with an AC power of 1.92 MWe and a DC power of 1.98 MWp. The power plant is connected to Finike TM at medium voltage level with a total of 2.7 km 1/0 AWG Raven Power Transmission Line.

Üretim
Yıllık Üretim Grafiği
Aylık Üretim Grafiği
Karbon Emisyon Grafiği
With a 77.98% performance rate at the Niğde Edikli location, which has a radiation intensity of 1,652 kWh/kWp/year, 1,423 MWh in the lowest month and 2,669 MWh in the highest month, generating 25 million kWh of electricity in total for the year.
Thus, with the electricity capacity to be generated annually, the electricity energy needs of 12,590 houses are met and when environmental factors are taken into consideration, 16,316 tons of carbon emissions are prevented while generating approximately 25 million kWh of electricity.

Teknik Veriler
Sayısal Veriler