Uluder Kahramanmaraş SPP
Uluder 2 Unlicensed Solar Power Plant was established in Kahramanmaraş Elbistan within Uluder Enerji Yatırımları AŞ. Installation works started in March 2017 and the plant was commissioned in two phases in August and September 2020. The plant was installed on approximately 190 acres of land using 37,800 260 Wp Polycrystalline PV panels and 330 33 kW solar inverters, with an AC power of 10.56 MWe and DC power of 10.81 MWp. The power plant is connected to Doğanköy TM at medium voltage level with a total of 17 km 3x3.0 AWG Power Transmission Line.

Production
Annual Production Chart
Monthly Production Chart
Carbon Emission Graph
With a 77.98% performance rate at the Niğde Edikli location, which has a radiation intensity of 1,652 kWh/kWp/year, 1,423 MWh in the lowest month and 2,669 MWh in the highest month, generating 25 million kWh of electricity in total for the year.
Thus, with the electricity capacity to be generated annually, the electricity energy needs of 12,590 houses are met and when environmental factors are taken into consideration, 16,316 tons of carbon emissions are prevented while generating approximately 25 million kWh of electricity.

Technical Data
Quantitative Data0